First Water!
Dear Safi, I have just picked up this report at Ngateu from Mr.Mkasa of the GemRock Drilling Company. Ngateu Secondary School Drilling Project Report
1. First water found at 62 meters
2. As of today, 25 February, 2011 drilling has reached 81 meters
3. We expect more water stikes as we drill more deeply according to survey report
4. We shall send some photos showing the water we have in the hole even though it is not enough at this point
5. We are proceeding with drilling down to 110 meters as recommended in the survey report
Mr. Mkasa, 25 February, 2011
Elizabeth and I will also take pictures as the drilling proceeds !
Regards, David ( Mtui)
1. First water found at 62 meters
2. As of today, 25 February, 2011 drilling has reached 81 meters
3. We expect more water stikes as we drill more deeply according to survey report
4. We shall send some photos showing the water we have in the hole even though it is not enough at this point
5. We are proceeding with drilling down to 110 meters as recommended in the survey report
Mr. Mkasa, 25 February, 2011
Elizabeth and I will also take pictures as the drilling proceeds !
Regards, David ( Mtui)

0 Comments:
Post a Comment
<< Home